Maintain · New owners

Starting your board

The pre-start checks and the magnet-key start sequence — plus stopping the engine and powering the board off.

Guide

Starting your board

Difficulty: Beginner Time: ~5 min Applies to: Gas boards Last updated: Sep 2026

Watch the walkthrough

Watch on YouTube ↗ · JETSURF USA — new owner series #5. Timestamps below follow the video's on-screen counter (0:27–2:44).

Once the board is out of the bag it's nearly ready to ride. Run the engine-bay checks first, then start it with the magnet key — one tap to wake the electronics, a second to crank. The same magnet key stops the engine and powers the board down.

You'll need

Pre-start checks

  1. 0:27 — Remove the engine cover: turn every toggle anti-clockwise about half a turn, then lift the cover off.
  2. 0:42 — Check the engine bay for debris or anything loose that could get into the moving parts.
  3. 0:51 — Check the fuel line is connected to the tank and every pipe is seated. Fuel is a 50:1 fuel/oil mix.
  4. 1:06 — Squeeze the throttle on the control handle a few times — it should move smoothly. If it's notchy, something may be caught around the cable at the base.
  5. Refit the engine cover and lock the toggles.

Starting the engine

  1. 1:20 — Place the magnet key into the top of the ignition handle.
  2. 1:33 — You'll hear the fuel pump / bilge pump run — that wakes the electronics and means the engine is ready.
  3. 1:44 — A flashing green light confirms the board is initiated and ready to start.
  4. 1:51 — Place the key into the holder a second time. After about three seconds the engine starts.

Stopping & powering off

  1. 2:12 — To stop a running engine, pull the key off the handle. The green light keeps flashing — the board stays initiated and ready to restart for about five minutes.
  2. 2:28 — To power the board off completely, hold the magnet key against the flashing green light. The light goes out and the board is off.
Tip: the magnet key is a two-tap system — first tap wakes the electronics (pump runs, green light flashes), second tap cranks the engine. If the green light isn't flashing, the second tap won't do anything.
Caution: only run the engine with a water supply — never start it dry out of the water for more than a brief moment. Always do the engine-bay and throttle checks before every session, and use only 50:1 pre-mix.
Keep riding

More guides on the way

We'll email you when the next maintenance tutorial goes live.